Metro Wiki
Building rules
Transfer tunnel, depot, walking radius and per-kind gradient/spacing limits in Metro.
General limits
- Max transfer tunnels
- 256
- Tunnels per station
- 4
- Max depots
- 16
- Station walking radius
- 800 m
- Goal place–stop reach
- 800 m
Gradient and spacing by line kind
| Kind | Max grade | Min stop spacing |
|---|---|---|
| Metro | 4% | 400 m |
| Funicular | 25% | 150 m |
| Tram | 7% | 150 m |
| Bus rapid transit | 12% | 350 m |
| Commuter rail | 2.5% | 500 m |
| Ferry | – | 400 m |
| High-speed rail | 1.5% | 15 km |
Categories: