Tunnels, bridges and depth
The long section shows stop levels and whether sections run above or below ground.
When this helps
The long section shows whether station levels and structure types work together across water or steep terrain. A tunnel or bridge can create a direct connection, but structure and depth change the cost. On a long water crossing, check type restrictions and neighbouring sections before building.
Step by step
- Place stops with Draw line. In Long section, click a section to choose Tunnel or Surface; a water crossing can become an underwater tunnel or bridge.


-
For types with adjustable levels, drag a stop up or down in the panel; double-click to restore the automatic level. Check red sections and grade warnings.
-
If the game says “Too steep between Kadıköy and Üsküdar. Change a station's level or move the stations apart.”, follow that advice. The metro limit is 4%; high-speed rail is 1.5%.
-
Trams and bus rapid transit follow the ground: their levels cannot be chosen and they cannot tunnel. A tram can build its own bridge over at most 200 m of water; use a city road bridge for wider water. Bus rapid transit crosses the Bosphorus only on marked bridges.
Limits and numbers
The metro grade limit is 4%, the high-speed limit 1.5%, and the high-speed bridge span limit 5,000 m. A tram's own bridge is limited to 200 m. Available structures differ by type: trams and bus rapid transit cannot tunnel. Grade depends on station level difference and section length.
Common errors
A high-speed rail bridge spans at most 5,000 m; an underwater tunnel can be chosen on a suitable section. If a bridge cannot rise high enough, make the neighbouring section surface or choose a tunnel. Available options depend on the type and terrain.
If the vehicle cannot enter a tunnel, raise the level or choose an allowed surface route. If a water stop must be on a bridge, inspect both neighbouring sections and make them surface as instructed. If a bridge cannot rise high enough, make the neighbouring section surface or choose a tunnel. If the span is too long, use a crossing within the type's limit or an eligible underwater tunnel.
Tips
- After changing one section, inspect both neighbours because their grades can change too.
- Returning to automatic levels helps compare a manual choice.
- Moving stops apart may reduce grade but can increase line length and cost.
- On touch devices drag the stop in the panel and tap the section option; read the cost before confirming.