Skip to content
YUMO Games
Menu
Guide

Build an intercity high-speed line

High-speed rail connects distant stops and carries intercity passengers on maps backed by Turkey data.

When this helps

High-speed rail connects distant cities and serves intercity demand on maps using Turkey data. Long sections and stations require substantial investment, with a rail depot, connection and trainsets also in the budget. Closely spaced urban stops are constrained by the high-speed minimum spacing.

Step by step

  1. In a city using Turkey tiles, wait for high-speed rail to unlock at the 1 million daily rider milestone. Build a rail depot with Depot → New depot.

  2. Choose Draw line, select High-speed rail, and place stops at least 15,000 m apart.

  3. Check levels and tunnel or surface sections in Long section. The maximum grade is 1.5% and the maximum bridge span is 5,000 m. Choose an underwater tunnel where appropriate. Check the cost and depot connection, then press Build.

Intercity YHT draft between Gebze, İzmit, and Adapazarı on the Turkey-data map with the profile panel
Intercity YHT draft between Gebze, İzmit, and Adapazarı on the Turkey-data map with the profile panel
  1. Once open, select a high-speed train, depot and line in Vehicles and press Buy. Inspect frequency and Fare in the line panel.
  2. The default high-speed fare has a base of 100 ₺ plus 2 ₺ per kilometre. Inspect the intercity section of a station panel to see these passengers.
Open YHT1 line linking Gebze, İzmit, and Adapazarı with the Intercity section open in the İzmit station panel
Open YHT1 line linking Gebze, İzmit, and Adapazarı with the Intercity section open in the İzmit station panel

Limits and numbers

The unlock is 1 million daily riders; stops must be at least 15,000 m apart, grade at most 1.5%, and bridge span at most 5,000 m. A depot connection is limited to 15,000 m. The default fare has a base and distance component; the line panel setting changes the result.

Common errors

If the vehicle has not unlocked, wait for the rider milestone and check that the map uses Turkey data. Move stops apart to meet the high-speed spacing limit. Change levels or route if the section is too steep. If a bridge span exceeds its limit, consider an underwater tunnel on a suitable section. If the depot is too far, build a compatible rail depot near the line.

Tips

  • First consider an affordable, operable stage between two strong destinations.
  • Even with few stops, a long section can be expensive.
  • After opening, select a compatible high-speed trainset; not every train in a rail depot fits the line.
  • On touch devices tap the map for stops and check the long section before building.

Related pages

Categories: